Back to Case Studies
Industrial Case Study: Commercial Logistics
Fleet Operator: DC Fast Charging Efficiency Gains
The Challenge
A major commercial fleet operator was seeing 8% power loss in their legacy charging infrastructure, leading to unsustainable operational costs across a 1,000-vehicle hub.
eDrift's Engineering Solution
We deployed a modular 50kW+ DC Fast Charging network utilizing eDrift's interleaved PFC controllers and specialized cooling, specifically optimized for high-utilization logistics environments.
Deployment Timeline
Month 1
Site audit & legacy loss analysis
Validation against Tier-1 automotive standards.
Month 2
Pilot deployment of 5 modular units
Validation against Tier-1 automotive standards.
Month 3-4
Full network swap & smart dashboard integration
Validation against Tier-1 automotive standards.