Industrial Case Study: Renewable Infrastructure
Regional Utility: Solar-Charging DC Microgrid
The Challenge
A smart city project required a 48V/96V DC microgrid interface capable of bi-directional power flow with 98.2% efficiency from a solar-fed DC bus.
eDrift's Engineering Solution
eDrift engineered a specialized isolated DC-DC topology with interleaved phase control to manage variable solar inputs and high-voltage vehicle charging.
Deployment Timeline
Month 1-3
Simulation & microgrid topology alignment
Validation against Tier-1 automotive standards.
Month 4-6
Custom hardware engineering & outdoor field testing
Validation against Tier-1 automotive standards.
Month 7
Full deployment & network-level load balancing
Validation against Tier-1 automotive standards.